Peer's Vrijheidslaan Bridge Reopens on November 13 After Renovation

The Agency for Roads and Traffic has renovated the bridge to improve structural integrity and prevent future damage.

(vergroot foto)

Stad Peer

The bridge on Vrijheidslaan over the Noordweg (N73) in Peer will reopen to through traffic on Friday, November 13, from 6 PM, after renovation works by the Agency for Roads and Traffic (AWV).

The bridge, which was in poor condition, underwent necessary maintenance. The AWV carried out concrete repairs and replaced the expansion joints. Additionally, the bridge received a new edge to prevent water from seeping into the bridge and causing damage.
These measures, combined with the application of a waterproof layer, are intended to protect the bridge from future damage. The works began on August 3, and the bridge has since been closed to both motorized traffic and cyclists.
Based on information from the official source: Stad Peer (09/11/2026)