Hulshout Municipality Approves New Sewerage and Safer Cycle Path on Booischotseweg

The project combines a separated sewerage system with a free-standing cycle path to improve traffic safety and water management.

Generic image of a road with a new bicycle lane and sidewalk in a green environment.
AI

Generic image of a road with a new bicycle lane and sidewalk in a green environment.

The municipality of Hulshout has granted permission for major works on the Booischotseweg. Between the centre and the Grote Nete, a new separated sewerage system and a free-standing two-way cycle path will be constructed.

The works on the Booischotseweg include the construction of a fully separated sewerage system. Rainwater and waste water will be discharged separately from now on. Rainwater from the centre of Hulshout will be discharged via a new rainwater sewer (RWA) towards the Sigmagebied at the Grote Nete. The waste water will be connected to the existing system.
At the same time, the road is being thoroughly redesigned to improve traffic safety. A free-standing two-way cycle path, new sidewalks, parking bays and a central divider will be installed. The municipality emphasises that these interventions make a difference for 'clean water and safe traffic'. In addition, rainwater is retained locally as much as possible through infiltration zones, making the neighbourhood more resilient to heavy rain.
The project ties in with the further development of the Sigmagebied, where future slow traffic connections for walkers and cyclists are planned. To limit the impact on nature, the permit provides for measures such as amphibian pipes and amphibian guidance.
Based on information from the official source: Gemeente Hulshout (25/11/2026)