The project uses shallow geothermal energy, also known as cold heat storage. Heat and cold are stored in groundwater and transported to connected buildings via a low-temperature network. Each building has its own heat pump that brings the water to the correct temperature for heating, cooling or hot water. The city of Geel receives subsidies from Agentschap Innoveren & Ondernemen and Sport Vlaanderen for the implementation.
In the first phase, municipal buildings will connect to the network: the swimming pool, the town hall, the Waai, cc de Werft and the library. The network is designed to grow with future public and private developments. The construction is intended to encourage (semi-)public buildings and new private developments to connect.
“"With this first borehole we are taking a concrete step towards fossil-free municipal buildings. By investing together in one collective system we avoid fragmentation of the underground and lay a foundation on which other building owners can also benefit in the long term."
The disruption during the works remains very limited, with visible works and noise nuisance during drilling. The municipal swimming pool remains accessible. The sustainable installation of the swimming pool is expected to be put into use in the spring of 2027. Works on the cluster at the town hall will start at the end of 2028.
More information about the project is available via warmtenetgeel.be. Subscribing to the project newsletter can be done via the Geel Academy.




